Interested Basket

Interested Basket

  • Loading...

Merlin Elements


Developer: Merlin & Ganges

Project RERA ID: HIRA/P/KOL/2019/000325

Merlin Elements

**Bhumi. Jala. Tejas. Vayu. Akash.
Where the elements of nature come together to create luxury living!!**

Elements stand for sunlight, fresh air, peace, happiness and wellness for you & for the members of your family.
Grab AC lifestyle homes right in the heart of South Kolkata, conveniently located between New Alipore & Tollygunge and a stone’s throw away from all hotspots of the city, Elements redefines the fine art of living!
The Vastu compliant apartments are designed to provide you with excellent cross-ventilated living space with cool breeze and these luxury homes let you enjoy a mesmerizing view of the city – look across to the expansive greens of the Tolly Club everyday.
  • Land Area : 2.23 Acre
  • Completion Date : Ready to Move
  • No. of Tower : 3
  • Open Space :70%
  • Height of Tower : B + Gr. + 12
  • Size (Built up Area) : 3 BHK 1257 sq.ft. - 1279 sq.ft. 4 BHK 1536 sq.ft.
Salable Area: Built up Area
  • No. of Apartments : 179
  • Price : 3 BHK 1.9 cr - 2 cr 4 BHK 2.4 cr

Map

Merlin Elements - Basanta Lal Saha Road, Ajoy Nagar, Buroshibtalla, Behala, Kolkata, West Bengal 700053

Get Direction
Education Institution
  • Sri Sri Academy2.1 KM
  • NSHM Knowledge Campus1 KM
  • Laxmipath Singhania School4 KM
Hospital
  • RSV Hospital1 KM
  • MR Bangur1.2 KM
  • CMRI4.8 KM
  • BM Birla Hospital4.6 KM
Hotspot
  • Tollygunge Metro2.8 KM
  • Rabindra Sarabar Metro1.4 KM
  • South City Mall2.8 KM
  • Lake Mall2.5 KM
Outdoor Yoga Deck

Outdoor Yoga Deck

AC Banquet

AC Banquet

Kids Pool

Kids Pool

Infinity Pool

Infinity Pool

Indoor Games Room

Indoor Games Room

Spa

Spa

Amphitheatre

Amphitheatre

Creche

Creche

Sauna

Sauna

Steam

Steam

Table Tennis

Table Tennis

Swimming Pool

Swimming Pool

Gymnasium

Gymnasium

Chess Room

Chess Room

Carrom

Carrom

Cards Room

Cards Room

Bedroom

  • Flooring: Vitrified tiles
  • Walls: Putty (ready for painting)
  • Doors: Wooden frame with commercial flush door
  • Windows: Aluminium powder coated windows with glass panes
  • Electrical: Modular switches of Havells/Anchor/North-west or reputed make with copper wiring

Living Room

  • Flooring: Large size vitrified tiles
  • Walls: Putty (ready for painting)
  • Doors: Wooden frame with laminated flush door
  • Windows: Aluminium powder coated windows with glass panes
  • Electrical: Modular switches of Havells/Anchor/North-west or reputed make with copper wiring

Kitchen

  • Flooring: Matt finish ceramic tiles
  • Dado: Ceramic tiles upto 2 ft height above the counter
  • Counter: Granite slab
  • Sink: Stainless sink with hot & cold water provision
  • Electrical: Modular switches of Havells/Anchor/North-west or reputed make with copper wiring

Toilet

  • Flooring: Anti-skid ceramic tiles
  • Wall: Designer ceramic tiles upto 7 ft height
  • Sanitary ware: Kholer/Roca/Grohe or equivalent make
  • C.P fittings: Jaquar/Kholer or equivalent make
  • Electrical: Modular switches of Havells/Anchor/North-west or reputed make with copper wiring
  • 3 BHK 1257 sq.ft. - 1279 sq.ft. (Built up Area) Price 1.9 cr - 2 cr
  • 4 BHK 1536 sq.ft. (Built up Area) Price 2.4 cr
  • Note: Price includes flat cost + extra charges.
  • Independent basement car parking: Rs. 6,00,000/-
  • N.B. Buyers are advised to check the price before making any final decision. Floor escalation charges Rs. 33/- per sq.ft on built up area from 2nd floor onwards.

Extra Charges

  • Legal & documentation charges: at actual
  • Transformer & electrical charges: at actual
  • Generator charges: at actual

Deposits

  • Advance maintenance charges: Rs.56.00 per sq.ft.
  • Sinking fund: Rs.56.00 per sq.ft.
  • Municipal deposit: at actual

Note

  • Bank approval: approved by SBI, HDFC
  • Cheque to be in favor of: MERLIN GANGES PROJECTS

Payment Schedule

Application / booking money 3,00,000/- + GST
Within 15 days from execution of agreement 10% + GST
Completion of pilling work of respective block 10% + GST
On completion of basement of respective block 7% + GST
On casting of 1st floor slab of respective block 7% + GST
On casting of 5th floor slab of respective block 7% + GST
On casting of 9th floor slab of respective block 7% + GST
On casting of roof slab of respective block 7% + GST
On commencement of brick work of respective block 7% + GST
On commencement of flooring of respective block 6% + GST
On commencement of lift installation of respective block 6% + GST
On commencement of outside paint of respective block 6% + GST
On possession of respective block 10% + GST